App. B: Terrace Net. Staff & Cost for 2,250 MW Project

Table 1 Total Construction costs based upon allocation of costs
from Tables 4, 8, 9, and 12 below

Facility Costs from Table 12             $100.9 MM
Construction Employment Table 4   (1)$256.8 MM
Bulldozer and Arctic Vehicle Costs Used for
Construction from Tables 8 and 9
$159.7 MM
Total Terrace Network Construction Costs$517.4 MM

1. Construction Crew staff:  164 for 1280 hr/yr at $24/hr (AECOM rate) *
1.42 (inflation from 2009-2023) * 5 yrs
Repair & Support staff: 132 for 1440 hr/yr at $24/hr (AECOM rate) *
1.42 (inflation from 2009-2023) * 5 yrs
Office general staff: 160 for 1920 hr/yr at $24/hr (AECOM rate) *
1.42 (inflation from 2009-2023) * 5 yrs
Management & technical staff: 160 for 12mo/yr at $10,000/mo (AECOM rate) *
1.42 (inflation from 2009-2023) * 5 yrs

Table 2 Total Maintenance costs for years 1 thru 4 based on
Allocation of costs from Tables 5, 10, and 11 below

Maintenance Employment:          (2)  $63.0 MM
Bulldozer and Arctic Vehicle Costs
Used for Maintenance  
$28.6 MM 
Facility maintenance  $6.1 MM
Office Supplies, Utilities etc.$4.0 MM
Four-year Total Terrace Network
Maintenance Costs (yrs. 1-4)
$101.6 MM
  
Total Average Annual Terrace
Network Maint. Costs (yrs. 1–4)   
$25.4 MM

2.  Maint. crew staff:  75 for 1280 hr/yr at $24/hr (AECOM rate) *
1.42 (inflation from 2009-2023) * 4 yrs
Repair & Support staff: 38 for 1440 hr/yr at $24/hr (AECOM rate) *
1.42 (inflation from 2009-2023) * 4 yrs
Office general staff: 45 for 1920 hr/yr at $24/hr (AECOM rate) *
1.42 (inflation from 2009-2023) * 4 yrs
Management & technical staff: 45 for 12mo/yr at $10,000/mo (AECOM rate) *
1.42 (inflation from 2009-2023) * 4 yrs

Table 3 Annual Terrace Network Maintenance Costs
for years 5 through 40 

Maintenance Employment:     (3)$31.4 MM
Bulldozer and Arctic Vehicle
Costs Used for Maintenance 
$14.3 MM
Facility Maintenance: 3% per yr.      $3.0 MM
Office Supplies, Utilities etc.       $2.0 MM
Total Annual Terrace Network
Maint. Costs Total (yrs. 5 – 40)
$50.8 MM

  1. Maint. crew staff: 150 for 1280 hr/yr at $24/hr (AECOM rate) * 1.42 (inflation from 2009-2023)
    Repair & Support staff: 75 for 1440 hr/yr at $24/hr (AECOM rate) * 1.42 (inflation from 2009-2023)
    Office general staff: 90 for 1920 hr/yr at $24/hr (AECOM rate) * 1.42 (inflation from 2009-2023)
    Management & technical staff: 90 for 12mo/yr at $10,000/mo (AECOM rate) * 1.42 (inflation from 2009-2023)

Table 4 Terrace Network Construction Staffing Profile

Project YearNumber of Employees
in Ice Sheet Construct.
Crews (4)
Number of
Employees in
Construction
Equipment
Repair Crews
and Crew
Support Personnel (6)
Total Number
of Employees
in Constr.

Management
Office,
Technical, & Other (7)
Total
Construction Employment
1264132320716
2264132320716
3264132320716
4264132320716
5264132320716

Table 5  Terrace Network Maintenance Staffing Profile

Project YearNumber of Employees
in Ice Sheet Maintenance
Crews (5)
Number of Employees in Maintenance Equipment Repair Crews and Crew Support
Personnel (6)
Total Number
of Employees
in Maint. Management, Office, Technical, & Other (7)
Total Maintenance Employment
130153681
2603072162
39045108243
412060144324
5 thru 4015075180405
  1. Three crew members per construction crew working on ice sheet terrace construction. 83 active 3 person crews plus 5 extra crews to account for absences.
  2. Three crew members per maintenance crew working on ice sheet terrace maintenance plus 10% extra to account for absences.
  3. Equipment repair crews working primarily at support base and as needed remotely on ice sheet. Support personnel working on cleaning and resupply of crew support vehicles. Also working on service jobs in support of other supply base personnel.
  4. Complete range of personnel needed to run the Terrace Construction and Maintenance component of the Tasersiaq Lake Hydro Project. This included management, purchasing, engineering, information technology, accounting, security, finance, personnel, etc.

Table 6 Terrace Network Construction Equipment

Project YearCat D7E   
Tracked
Bulldozers
in Service
(8)
Arctic
All Terrain
Vehicles in
Service (10)
Special
transport
and retrieval
Packages in

Service (11)
1881762
2881762
3881762
4881762
5881762

Table 7 Terrace Network Maintenance Equipment

Project YearExcavators
in Ice Sheet

Maintenance
(9)
Arctic
All Terrain
Vehicles in
Service (10)
Special
transport
and retrieval
Packages in

Service (11)
110211
220421
330632
440842
5 thru 50501052
  1. Used for construction phase. Caterpillar D7E series or equivalent. Includes 10 % spares.
  2. Used for maintenance of terrace channels. Caterpillar 320 GC Excavator or equivalent. Includes 10 % spares
  3. Two Arctic All Terrain Vehicles per crew plus 10 % spares, plus 5% for emergency medical services etc. Burlak 4X4 or equivalent
  4. 2 mobile heavy lift cranes plus Large Arctic Transport Tracked vehicle and sled for each special transport package. Used to retrieve disabled vehicles from ice sheet.

Table 8 Bulldozers Cat D7E used for Construction
Annual costs of Fuels, Parts, Depreciation, Interest

Fuels 2000 hr./yr. Per D7E Dozer (12)$65,000
Repair Parts 10%/yr. Per D7E Dozer (13)$67,500
Depreciation 10%/yr. Per D7E Dozer$67,500
Interest 7%/yr. Per D7E Dozer$47,250
Number of D7E  Dozers in service88
  
Total Construction D7E Annual Costs$21.8 MM
  1. D7E fuel consumption 25 liters per hour at $1.30 per liter.
  2. D7E initial cost $675,000.

Table 9 All Terrain Vehicles Burlak 4X4 used for Construction
Annual costs of Fuels, Parts, Depreciation, Interest

Fuels 500 hr./yr. Per Burlak 4X4 ATV (14)$3,900
Repair Parts 10%/yr. Per Burlak 4X4 ATV (15)$20,000
Depreciation 10%/yr. Per  Burlak 4X4 ATV$20,000
Interest 7%/yr. Per Burlak 4X4 ATV$14,000
Number of Burlak 4X4 ATV in service for
construction crews
176
  
Total Construction Burlak 4X4 ATV Annual Costs$10.2 MM
  1. Burlak 4X4 fuel consumption 6 liters per hour at $1.30 per liter.
  2. Burlak 4X4 initial cost $200,000.

Table 10 Excavators Cat 320GC used for Maintenance
Annual costs of Fuels, Parts, Depreciation, Interest

Fuels 2000 hr./yr. Per Cat 320GC Excavator  (16)$41,600
Repair Parts 10%/yr. Per Cat 320GC Excavator (17)$45,300
Depreciation 10%/yr. Per Cat 320GC Excavator$45,300
Interest 7%/yr. Per Cat 320GC Excavator  D7E$31,710
Number of Cat 320GC Excavator in service50
  
Total Maintenance Cat 320GC Excavator  Annual Costs$8.2 MM
  1. 320GC fuel consumption 16 liters per hour at $1.30 per liter.
  2. 320GC initial cost $453,000.

Table 11 All-Terrain Vehicles Burlak 4X4 used for Maintenance
Annual costs of Fuels, Parts, Depreciation, Interest

Fuels 500 hr./yr. Per Burlak 4X4 ATV (18)$3,900
Repair Parts 10%/yr. Per Burlak 4X4 ATV (19)$20,000
Depreciation 10%/yr. Per  Burlak 4X4 ATV$20,000
Interest 7%/yr. Per Burlak 4X4 ATV$14,000
Number of Burlak 4X4 ATV in service for
maintenance crews
105
  
Total Maintenance Burlak 4X4 ATV Annual Costs$6.1 MM
  1. Burlak 4X4 fuel consumption 6 liters per hour at $1.30 per liter.
  2. Burlak 4X4 initial cost $200,000.

Table 12 Terrace Network Facilities Cost of Construction
at Kangerlussuaq.

Equipment winter storage building   
$700 per m^2 * 12,500 m^2
$8.8 MM
Maintenance and repair building
$1050 per m^2 * 5,250 m^2
$5.5 MM
Arctic All Terrain Vehicle Resupply Facility
$1100 per m^2 * 18,000 m^2
$19.8 MM
Offices for Terrace Component of Hydro
Project $1600 per m^2 * 5,250m^2
(15 m^2 per office employee) 
$8.4 MM
Furnishing, office equipment, tools, food
service, & cleaning equipment
$ 20,000 per base employee * 1000 base
employees    
$20.0 MM
Crew Quarters for ice sheet crews
 $1600 per m^2 * 400 crew members *
60 m^2 per member  
$38.4 MM
Total Facility Construction Costs  $100.9 MM